Student Project 2004

ANALYSIS OF DEEP DRAWING TITANIUM AND ITS ALLOYS USING FINITE ELEMENT SIMULATIONSJun-04
REDUCING THE DESIGN LEAD TIME BY INTERFACING VISUAL BASIC WITH SOLID EDGEJun-04
A SOLUTION TO THE FACILITY LAYOUT PROBLEM HAVING INNER STRUCTURE WALLS AND PASSAGES USING PARTICLE SWARM OPTIMIZATIONJun-04
WELDING OF NINE PERCENT NICKEL STEEL FOR CRYOGENIC APPLICATIONSJun-04
MACHINE GROUPING IN ALTERNATE ROUTING ENVIRONMENT USING ANT COLONY TECHNIQUE TOWARDS LEAN PRODUCTIONJun-04
CNC MILLING PART PROGRAM GENERATION FROM  CAD MODEL WITH OPTIMUM NUMBER OF PASSES USING GENETIC ALGORITHMJun-04
DESIGN AND SIMULATION OF MEMS BASED PIEZORESISTIVE PRESSURE SENSORJun-04
STUDY OF WRINKLING BEHAVIOUR USING TRACTRIX DIE AND FORMING LIMIT DIAGRAM ANALYSIS OF INTERSTITIAL FREE MILD STEELJun-04

SHEET METAL FORMING SIMULATION AND SPRING BACK ANALYSIS

       Dec-04
SIMULATION OF UPSET FORGING        Dec-04
FINITE ELEMENT ANALYSIS IN PRECISION ENGINEERINGDec-04
PARAMETRIC MODELING OF GEAR SYSTEMDec-04
FINITE ELEMENT ANALYSIS IN TOOL ENGINEERINGDec-04
SIMULTANEOUS OPTIMAL SELECTION OF DESIGN AND MACHINING TOLERANCES WITH DIFFERENT STACK-UP CONDITIONS USING SIMULATED ANNEALING ALGORITHMDec-04
MULTI SPEED GEARBOX DESIGN USING ANT COLONY OPTIMISATION TECHNIQUEDec-04
MODULAR FIXTURE LAYOUT OPTIMIZATIONDec-04
FINITE ELEMENT ANALYSIS OF PRESSURE PARTS USING ANSYSDec-04
FORMING LIMIT DIAGRAM OFR INTERSTITIAL FREE STEELDec-04
DESIGN AND DEVELOPMENT OF AN EFFICIENT LOGISTICS MANAGEMENT SYSTEMJune 2004
OPERATIONS MANAGEMENT SYSTEM FOR CONTINUOUS FLOW MANUFACTURINGJune 2004
A NEURAL NET APPROCH TO REAL TIME FLOW SHOP SCHEDULINGJune 2004
SIMULTANEOUS SCHEDULING OF JOBS AND AUTOMATED GUIDED VEHICLES USING ANT COLONY ALGORITHMJune 2004
MULTI PROJECT SCHEDULING USING HEURISTIC AND GENETIC ALGORITHMJune 2004
ASSEMBLY TASK SCHEDULING USING GENETIC ALGORITHMJune 2004
A MULTI OBJECTIVE ADAPTIVE GENETIC ALGORITHM FOR SIMULTANEOUS SCHEDULING OF JOBS AND AUTOMATED GUIDED VEHICLESJune 2004
FLOW SHOP SCHEDULING WITH LIMITED BUFFER SPACEJune 2004
DELINQUENCY STAGE PREDICTION:A COMPARATIVE VIEW OF MARKOV PROCESSES AND LOGISTIC REGRESSION MODELING TECHNIQUESJune 2004
AGV TASK SCHEDULING USING NON-TRADITIONAL OPTIMIZATIONJune 2004
IMPLEMENTATION OF TABU SEARCH ALGORITHM TO MACHINE-GROUPING FOR CELLULAR MANUFACTURING SYSTEMJune 2004
IMPLEMENTATION OF GRASP IN FLOW SHOP SCHEDULINGJune 2004
DESIGNING INVENTORY MODULE AND DEVISING IMPLEMENTATION METHODOLOGY FOR MAAGESJune 2004
MODIFIED GENETIC ALGORITHM FOR PRODUCTION DISTRIBUTION OPTIMIZATION OF MULTISTAGE LOGISTICS NETWORKJune 2004
MODERN MAINTENANCE TECHNIQUES AND APPLICATION OF SAPJune 2004
SUPPLY CHAIN OPTIMIZATION USING PARTICLES SWARM OPTIMIZATION(PSO)June 2004
NON-LINEAR OPTIMIZATION OF PRODUCT MIXJune 2004
 
SCATTER SEARCH TECHNIQUE FOR JOB SHOP SCHEDULING.Dec-2004
GENETIC ALGORITHM BASED MULTI OBJECTIVE TOLERANCE  ALLOCATION PROBLEM Dec-2004
PARTICLE SWARM OPTIMIZATION ALGORITHM FOR MULTI OBJECTICVE FLOW SHOP SCHEDULING WITH REGULAR AND NON REGULAR MEASURESDec-2004
LAYOUT OPTIMIZATION USING TABU SEARCH HEURISTICDec-2004
MULTI ECHELON DISTRIBUTION INVENTORY SUPPLY CHAIN MODEL USING  PARTICLE SWARM OPTIMIZATIONDec-2004
MODELING AND SIMULATION OF PROJECTS WITH PETRI  NETSDec-2004
MIXED MODEL ASSEMBLY LINE BALANCING USING ANT COLONY OPTIMIZATIONDec-2004
PARALLE LINE JOB SHOP SCHEDULING USING PARTICLE SWARM OPTIMIZATIOPNDec-2004
AS/RS SCHEDULING IN FMS USING ADAPTIVE GENERIC ALGORITHMDec-2004
SOLUTION TO PERMUTATION FLOW SHOP SCHEDULING PROBLEM USING BICRITERIA GRASP APPROACHDec-2004
INVENTORY CONTROL    (RAW MATERIALS & CONSUMABLES)Dec-2004
OPTIMIZATION OF DIE SET-UP USING SINGLE MINUTES EXCHANGE OF DIESDec-2004
ARTIFICIAL IMMUNE SYSTEM APPROACH TO SOLVE JOB SHOP SCHEDULING PROBLEMSDec-2004
ESTABLISHMENT OF WELD QUALITY IN RESISTANCE SPOT WELDINGDec-2004
ANALYSIS AND APPLICATION OFCREAFT ALGORITHM TO THE LAYOUT OF TEXTILE CARDING MACHINE MANUFACTORDec-2004