3 PI Completed Patents, Product, Publications, High-end Workshops and Short-term courses
S.No. Project Title Sponsoring Agency Period Amount (Rupees in Lakhs)
1. Ultra-low-power Sakthi RISC V-based light-weight Edge AI Processor for IOT enabled Healthcare Applications MeitY 2024 - 2029 NITT – 96
Total – 288
2. Design and Development of FinFET Biosensor for Wearable Medical Devices in Harsh Environment TARE-DST 2022 2025 18.3
3. Centre for SoC Design and Fabrication Alumnus 2021 - 2025 188.5
4. Indigenous Machine Learning/ArtificialIntelligence (ML/AI) Hardware/Software Framework for Vyomnoids RESPOND ISRO 2021-2023 49.55
5. Design of Digital Signal Processor using SCL foundry STIC - ISRO 2021-2023 12.8
6. Adaptive Telemetry System for Launch vehiclesDemonstration of Proof of Concept RESPOND ISRO 2019 - 2021 23.66
7. Self-Energised UAV-assisted Communications for 5G Wireless Networks SPARC, MHRD 2019 - 2021 73
8. Energy efficient implementation of Multi-modular Exponential techniques for Public-key Cryptosystems DST 2018 - 2021 35
9. In depth investigation on corrosion and tribological studies on expandable engine DRDO 2018 - 2021 98.85
10. Full Duplex and Cognitive Radio Architectures for Spectrally Efficient Communications (FD- CR-ASEC) UGC - UKIERI 2017 - 2020 107
11. Design and Implementation of Digital Modules of on-Chip Speech Recognition System MeitY 2015 - 2020 79.76
12. SMDP - C2SD project MeitY 2015 - 2020 167
13. CENTRE for ENTREPRENEURSHIP DEVELOPMENT and INCUBATION (CEDI) SONATA Software, Bangalore 2015 - 2018 120
14. Setting up Wireless System design laboratory FIST, DST 2013 - 2017 60
15. Technology Incubaon and Development of Entrepreneurs (TIDE) in the Areas of Electronics and ICT - CEDI DeitY, New Delhi 2012 - 2015 60
16. Rural and Remote Ubiquitous Broadband Wireless Access UKIERI - DST 2012 - 2014 £40000
17. Low complexity Energy efficient Transceivers for Cognitive Radio System UKIERI - DST 2012 - 2014 £21000
18. Design and Implementation of MB-OFDM UWB Transceiver Modules using Asynchronous Pipelining DeitY 2008 - 2011 33.5
19. Special Manpower Development programme for VLSI (SMDP-II) MeitY 2006 - 2012 109


Consultancy Projects



S.No. Project Title The agency to whom the submitted Duration Amount (Rupees in Lakhs)
1. Algorithmic approach to achieve maximum functional coverage using Constrained Random verification platform Maxvy Technologies, Bengalore 6 months 2.693