Projects and Consultancy

Sl.

No.

Title of the Project

 

Amount

in Rs.

(Lakhs)

Funding Agency

Period

 

Remarks (Completed/ Ongoing)

1.

Pollution measurement  on Dummy Insulators installed on various 400 KV Transmission Lines under Neyveli TLM Hub

1.00

Power Grid corporation of India Limited

2007-2008

Completed

2.

Environmental management plan for NH 67 (km 80.000 – 136.490)

0.45

Trichy- Thanjavur expressways limited

2007-2008

Completed

  1. 3.

Soil investigation for the implementation of CWSS to Ramnad and other 4 municipalities 11 town panchayats and 3163 rural habitation in Ramanathapuram, Sivagangai and Pudukottai district-package VII-corrosive nature of soil

1.40

Tamilnadu Water and Drainage Board

2007-2008

Completed

4.

Soil investigation for the implementation of CWSS to 5 municipalities 11 town panchayats and 3163 rural habitation in Ramanathapuram, Sivagangai and Pudukottai districts-corrosive nature of soil

0.876

Tamilnadu Water and Drainage Board

2007-2008

Completed

5.

Environmental monitoring report

Rehabilitating north & south break water at Nagapatinam port by extending the existing break water to a length of 200 meters-phase II (May 2007)

0.65

Tamilnadu Maritime Board

2007-2008

Completed

6.

Environmental monitoring report

Dredging 1575 meters long operable portion of Kaduvaiyur river at Nagapattinum port to a depth of (-) 4 meters phase II.

0.35

Tamilnadu Maritime Board

2007-2008

Completed

7.

Environmental monitoring report

Rehabilitating the eastern bank of Kaduvaiyur river at Nagapattinum port by providing a diaphragm wall to a length of 650 meters so as to maintain the river depth and to prevent erosion of eastern river bank- phase II.

0.35

Tamilnadu Maritime Board

2007-2008

Completed

8.

Testing of soil sample for corrosive nature Ramnad CWSS -package IV (Pudukottai)

0.674

Tamilnadu Water and Drainage Board

2008-2009

Completed

9.

Testing of soil sample for corrosive nature Ramnad CWSS -package IV (Devakottai)

0.674

Tamilnadu Water and Drainage Board

2008-2009

Completed

10.

Environmental Management Plan For Integrated Bus Stand In Devadanam, Tiruchirappalli

0.25

Tiruchirappalli City Corporation

2008-2009

Completed

11.

Construction of Sewage treatment plants at Avaniyapuram (125 MLD) & Sakkimangalam (45.7 MLD), (Quality testing, Verifying Mechanical means, Verifying specifications, Type of materials used and to check all the conditions as per the agreement)

Coordinators : Dr. C. Natarajan & Dr. S. T. Ramesh

15

Madurai Corporation

2009-2011

Completed

12.

Solid waste quantity estimation (approximate): Ariyamangalam compost yard, Tiruchirappalli

0.25

Tiruchirappalli City Corporation

2011-2012

Completed

13.

Designing, providing, constructing, erection and commissioning, start-up and performance 1 trial run for 6 months followed by 5 years of O & M of 6 MLD capacity sewage treatment plant (STP) at ANAIMEDU with selected modern technology in Salem City Municipal Corporation in Tamilnadu on DBOT basis – (Third party consultancy for verifying the Construction and Mechanical means)

Coordinators : Dr. C. Natarajan & Dr. S. T. Ramesh

1.4

Salem City Municipal Corporation

2011-2012

Completed

14.

Designing, providing, constructing, erection and commissioning, start-up and performance 1 trial run for 6 months followed by 5 years of O & M of 13 MLD capacity sewage treatment plant (STP) at VELLA KUTTAI with selected modern technology in Salem City Municipal Corporation in Tamilnadu on DBOT basis (Third party consultancy for verifying the Construction and Mechanical means)

Coordinators : Dr. C. Natarajan & Dr. S. T. Ramesh

1.5

Salem City Municipal Corporation

2011-2012

Completed

15.

Designing, providing, constructing, erection and commissioning, start-up and performance 1 trial run for 6 months followed by 5 years of O & M of 35 MLD capacity sewage treatment plant (STP) at MANKUTTAI with selected modern technology in Salem City Municipal Corporation in Tamilnadu on DBOT basis – (Third party consultancy for verifying the Construction and Mechanical means)

Coordinators : Dr. C. Natarajan & Dr. S. T. Ramesh

3.5

Salem City Municipal Corporation

2011-2012

Completed

16.

Solid waste management Work Package VII – Landfill and waste processing unit

6.0

Madurai Corporation

2011-2012

Completed

17.

Water quality study of cooling water system and the Suggestions / proposals to meet the water quality requirement for seamless steel tube plant, Bharat Heavy Electrical Limited, Trichy

0.65

BHEL, Trichy

2011-2012

Completed

18.

Post project environmental monitoring (Water, Air, Noise and soil quality)

2 Lakhs

(as of December 2013)

Trichy- Thanjavur expressways limited

 

-

Ongoing

19.

Baseline data for Water, Air and Noise Quality

(Quarrying of sand shoals, Kattalai Barrage across Cauvery River over an extent of 256.06 Hectares)

1.5

(as of September 2014)

 

River Conservatory division,

Tamilnadu Public works department

2014-2015

Completed

20.

Baseline data for Water, Air and Noise Quality

(Quarrying of sand shoals, Kattalai Barrage across Cauvery River over an extent of 256.06 Hectares)

1.5

(as of September 2014)

 

River Conservatory division,

Tamilnadu Public works department

2014-2015

Completed

21.

Design, Supply, Delivery, Erection, Testing & Commissioning of SCADA instrumentation & Telemetry system and head works & on reservoirs at various locations of Trichy city municipal corporation area with GPRS communication with all necessary accessories and sluice valve with actuator including operation and maintenance for Five years (Third party Inspection for quality assurance and technical suggestion)

1.00

(as of September 2014)

 

Tiruchirappalli City Corporation

2014-2014

Completed

22.

Implementation plan for scientific closure of the municipal solid waste dump site at ramayanapatti for tirunelveli city municipal corporation

1.5

 

Tirunelveli City Corporation

2015

Ongoing

23.

Report on the technical feasibility of revamping of existing sewage treatment plant of 75 kld capacity in income tax staff quarters campus, meenambalpuram, madurai

0.25

CPWD,

Madurai Central Sub Division, Madurai

2015

Completed

24.

Green waste composting: technology,

Facility design and environmental management

1.75

InfraEn (India) Pvt. Ltd, Bangalore

2015

Ongoing

25.

Technical feasibility of sewage treatment plant of 200 kld capacity of fbbr in m/s p.s. Precious hana grand mall llp, velachery, chennai

1.00

 CLAR Aqua Pvt Ltd, Chennai

2015

Completed

26.

Vetting for the design parameters, design calculations and drawings of water supply, sewerage disposal, Rain water Harvesting and Fire fighting works (Both internal and External)

1.5

Muhesh & Associates

Salem

2015

Ongoing