| Title of Project | Funding Agency | Duration | Status | Role | 
		
			| From | To | Ongoing/ Completed | 
		
			| Investigation and development of low cost emission contRol system for casting industries. | SERB - TARE | 2024 | 2027 | Ongoing | PI | 
		
			| Development of New Electrode Using 92% Rutile Grade Flux With Improved Operability and Industrial Applicability | IREL (India) Limited | 2022 | 2024 | Completed | PI | 
		
			| Development of nano composite coating on MMAW electrodes for reduction of hazardous constituents in welding fume | DST-AMT | 2018 | 2020 | Completed | PI | 
		
			| Development and Thermal Analysis of Non-Azide Gas Generating Compositions forAutomotive Airbag Systems
 | DST-SERB | 2018 | 2021 | Completed | PI | 
		
			| Measurement of Particulate Matters (PM 2.5, PM 1, PM 0.5, PM 0.25) of the SMAWFumes for the Consumables Used in the Fabrication of Nuclear Components
 | IGCAR, Kalpakkam | 2017 | 2018 | Completed | PI | 
		
			| Specific Electrical Conductivity of Kerosene Based Fuels | ISRO- LPSC, Trivandrum | 2016 | 2017 | Completed | PI | 
		
			| Experimental Investigation of Impact Initiation of Sound Light emitting Pyrotechnic Composition | ARMREB, DRDO | 2015 | 2019 | Completed | PI | 
		
			| Analysis of Welding fumes for Consumables used in fabrication of Nuclear components | IGCAR | 2014 | 2017 | Completed | PI | 
		
			| Design of Experimental matrix for Heat Transfer Studies at Super critical test Facility | BHEL, Trichy | 2012 | 2013 | Completed | PI | 
		
			| Modeling of Environmental Emission and Design and Development of Fuzzy controlled Fume Extraction System for Electric Discharge Machining Process | Ministry of Environment and Forest, Government of India | 2009 | 2013 | Completed | PI |