Title of Project
|
Funding Agency
|
Duration
|
Status
|
Role
|
From
|
To
|
Ongoing/ Completed
|
Development of New Electrode Using 92% Rutile Grade Flux With Improved Operability and Industrial Applicability |
IREL (India) Limited |
2023 |
2024 |
Ongoing |
PI |
Development of nano composite coating on MMAW electrodes for reduction of hazardous constituents in welding fume
|
DST-AMT
|
2018
|
2020
|
Completed
|
PI
|
Development and Thermal Analysis of Non-Azide Gas Generating Compositions for
Automotive Airbag Systems
|
DST-SERB
|
2017
|
2019
|
Completed
|
PI
|
Measurement of Particulate Matters (PM 2.5, PM 1, PM 0.5, PM 0.25) of the SMAW
Fumes for the Consumables Used in the Fabrication of Nuclear Components
|
IGCAR,
Kalpakkam
|
2017
|
2018
|
Completed
|
PI
|
Specific Electrical Conductivity of Kerosene Based Fuels
|
ISRO- LPSC,
Trivandrum
|
2016
|
2017
|
Completed
|
PI
|
Experimental Investigation of Impact Initiation of Sound Light emitting Pyrotechnic Composition
|
ARMREB, DRDO
|
2016
|
2019
|
Completed
|
PI
|
Analysis of Welding fumes for Consumables used in fabrication of Nuclear components
|
IGCAR
|
2014
|
2017
|
Completed
|
PI
|
Design of Experimental matrix for Heat Transfer Studies at Super critical test Facility
|
BHEL, Trichy
|
2012
|
2013
|
Completed
|
PI
|
Modeling of Environmental Emission and Design and Development of Fuzzy controlled Fume Extraction System for Electric Discharge Machining Process
|
Ministry of Environment and Forest, Government of India
|
2010
|
2013
|
Completed
|
PI
|