PR406
WORK DESIGN AND FACILITIES PLANNING
Methods study - motion and time study, and productivity - micromotion and macromotion study - Ergonomics.
Work measurement - techniques of work measurement - time study - production study.
Facility layout - steps in facility location study - layout types and analysis.
Layout design process - systematic layout planning - analysis - designing the layout - Assignment model
Computerized layout planning - CRAFT, ALDEP & CORELAP
REFERENCES
Barnes, “Motion and time study”, John Wiley, New York, 1990.
Apple, J.M. "Plant Layout and Materials Handling", Ronald Press Company, New York, 1977
ILO, “Introduction to workstudy”, ILO,Geneva,1974
PR 352 QUALITY, RELIABILITY AND MAINTENANCE
Control Charts-Quality- basic concepts- concepts of control charts-types of control charts- and R charts - p charts- c charts
Acceptance Sampling-Acceptance sampling-concepts of sampling-constructing operating characteristics curve-single, double multiple and sequential sampling plans
Quality Systems-Quality systems- principles - certification and accreditation schemes Development of quality circles -Process of total quality management and Taguchi’s method-
Reliability- mean time between failures (MTBF)-mean time to failure (MTTF) Failure data analysis
Maintenance Planning& Condition Based Maintenance-on - load and off-level monitoring-methods of condition monitoring.
REFERENCES
Govil, "Reliability Engineering", Tata McGraw Hill Co., New Delhi, 1983.
Srimath, "Concepts of Reliability", Affiliated East-West Pvt. Ltd., 1975.
Kelly & Harris, "Management of Industrial Maihttp://10.1.39.24/ntenance", Newres Butterworth, 1978.