PR406

WORK DESIGN AND FACILITIES PLANNING


Methods study - motion and time study, and productivity - micromotion and macromotion study - Ergonomics.


Work measurement - techniques of work measurement - time study - production study.


Facility layout - steps in facility location study - layout types and analysis.


Layout design process - systematic layout planning - analysis - designing the layout - Assignment model


Computerized layout planning - CRAFT, ALDEP & CORELAP


REFERENCES

  1. Barnes, “Motion and time study”, John Wiley, New York, 1990.

  2. Apple, J.M. "Plant Layout and Materials Handling", Ronald Press Company, New York, 1977

  3. ILO, “Introduction to workstudy”, ILO,Geneva,1974




PR 352 QUALITY, RELIABILITY AND MAINTENANCE



Control Charts-Quality- basic concepts- concepts of control charts-types of control charts- and R charts - p charts- c charts


Acceptance Sampling-Acceptance sampling-concepts of sampling-constructing operating characteristics curve-single, double multiple and sequential sampling plans


Quality Systems-Quality systems- principles - certification and accreditation schemes Development of quality circles -Process of total quality management and Taguchi’s method-


Reliability- mean time between failures (MTBF)-mean time to failure (MTTF) Failure data analysis


Maintenance Planning& Condition Based Maintenance-on - load and off-level monitoring-methods of condition monitoring.



REFERENCES

  1. Govil, "Reliability Engineering", Tata McGraw Hill Co., New Delhi, 1983.

  2. Srimath, "Concepts of Reliability", Affiliated East-West Pvt. Ltd., 1975.

  3. Kelly & Harris, "Management of Industrial Maihttp://10.1.39.24/ntenance", Newres Butterworth, 1978.