Sl.No.
|
Title of the Project
|
Funding Agency
|
Period
|
Remarks (Completed/ Ongoing)
|
1.
|
Pollution measurement on Dummy Insulators installed on various 400 KV Transmission Lines under Neyveli TLM Hub
|
Power Grid corporation of India Limited
|
2007-2008
|
Completed
|
2.
|
Environmental management plan for NH 67 (km 80.000 – 136.490)
|
Trichy- Thanjavur expressways limited
|
2007-2008
|
Completed
|
3.
|
Soil investigation for the implementation of CWSS to Ramnad and other 4 municipalities 11 town panchayats and 3163 rural habitation in Ramanathapuram, Sivagangai and Pudukottai district-package VII-corrosive nature of soil
|
Tamil Nadu Water and Drainage Board
|
2007-2008
|
Completed
|
4.
|
Soil investigation for the implementation of CWSS to 5 municipalities 11 town panchayats and 3163 rural habitation in Ramanathapuram, Sivagangai and Pudukottai districts-corrosive nature of soil
|
Tamil Nadu Water and Drainage Board
|
2007-2008
|
Completed
|
5.
|
Environmental monitoring report: Rehabilitating north & south break water at Nagapatinam port by extending the existing break water to a length of 200 meters-phase II (May 2007)
|
Tamil Nadu Maritime Board
|
2007-2008
|
Completed
|
6.
|
Environmental monitoring report: Dredging 1575 meters long operable portion of Kaduvaiyur river at Nagapattinum port to a depth of (-) 4 meters phase II.
|
Tamil Nadu Maritime Board
|
2007-2008
|
Completed
|
7.
|
Environmental monitoring report: Rehabilitating the eastern bank of Kaduvaiyur river at Nagapattinum port by providing a diaphragm wall to a length of 650 meters so as to maintain the river depth and to prevent erosion of eastern river bank- phase II.
|
Tamil Nadu Maritime Board
|
2007-2008
|
Completed
|
8.
|
Testing of soil sample for corrosive nature Ramnad CWSS -package IV (Pudukottai)
|
Tamil Nadu Water and Drainage Board
|
2008-2009
|
Completed
|
9.
|
Suitability of Bar Wrapped Concrete Cylinder Pipe Versus MS Pipes for Water Supply Schemes In Ramanathapuram, Sivaganga And Pudukottai Districts
|
Tamil Nadu Water Supply and Drainage board
|
2008
|
Completed
|
10.
|
Testing of soil sample for corrosive nature Ramnad CWSS -package IV (Devakottai)
|
Tamil Nadu Water and Drainage Board
|
2008-2009
|
Completed
|
11.
|
Environmental Management Plan for Integrated Bus Stand in Devadanam, Tiruchirappalli
|
Tiruchirappalli City Corporation
|
2008-2009
|
Completed
|
12.
|
Construction of Sewage treatment plants at Avaniyapuram (125 MLD) & Sakkimangalam (45.7 MLD), (Quality testing, Verifying Mechanical means, verifying specifications, Type of materials used and to check all the conditions as per the agreement)
|
Madurai Corporation
|
2009-2011
|
Completed
|
13.
|
Technical Service for providing BT Road in BHEL complex
|
BHEL Tiruchirappalli
|
|
|
14.
|
Solid waste quantity estimation (approximate): Ariyamangalam compost yard, Tiruchirappalli
|
Tiruchirappalli City Corporation
|
2011-2012
|
Completed
|
15.
|
Review of Implementation plan for Scientific Closure of the Municipal Solid Waste Dumpsite
|
Madurai Corporation
|
2011-2012
|
Completed
|
16.
|
Water quality study of cooling water system and the Suggestions / proposals to meet the water quality requirement for seamless steel tube plant, Bharat Heavy Electrical Limited, Trichy
|
BHEL, Trichy
|
2011-2012
|
Completed
|
17.
|
Post project environmental monitoring (Water, Air, Noise and soil quality)
|
Trichy- Thanjavur expressways limited
|
2013
|
Completed
|
18.
|
Baseline data for Water, Air and Noise Quality
(Quarrying of sand shoals, Kattalai Barrage across Cauvery River over an extent of 256.06 Hectares in Mayanur village, krishnarayapuram taluk, Karur district)
|
River Conservatory division,
Tamilnadu Public works department
|
2014-2015
|
Completed
|
19.
|
Baseline data for Water, Air and Noise Quality
(Quarrying of sand shoals across Cauvery River over an extent of 196.25 Ha in Sriramasamuthiram and Silaipillyarputhur villages in Thottium Taluk of Trichy district)
|
River Conservatory division,
Tamilnadu Public works department
|
2014-2015
|
Completed
|
20.
|
Design, Supply, Delivery, Erection, Testing & Commissioning of SCADA instrumentation & Telemetry system and head works & on reservoirs at various locations of Trichy city municipal corporation area with GPRS communication with all necessary accessories and sluice valve with actuator including operation and maintenance for Five years (Third party Inspection for quality assurance and technical suggestion)
|
Tiruchirappalli City Corporation
|
2014-2014
|
Completed
|
.21.
|
Report on the technical feasibility of revamping of existing sewage treatment plant of 75 kld capacity in income tax staff quarters campus, meenambalpuram, Madurai
|
CPWD,
Madurai Central Sub Division, Madurai
|
2015
|
Completed
|
22.
|
Review of Implementation plan for Scientific Closure of the Municipal Solid Waste Dumpsite
|
Tirunelveli City Municipal Corporation
|
2015
|
Completed
|
23.
|
Green waste composting: technology,
Facility design and environmental management
|
InfraEn (India) Pvt. Ltd, Bangalore
|
2015
|
Completed
|
24.
|
Technical feasibility of sewage treatment plant of 200 KLD capacity of FBBR in m/s p.s. Precious Hana grand mall llp, Velachery, Chennai
|
CLAR Aqua Pvt Ltd, Chennai
|
2015
|
Completed
|
25.
|
Vetting for the design parameters, design calculations and drawings of water supply, sewerage disposal, Rain water Harvesting and Firefighting works (Both internal and External)
|
Mukesh & Associates
Salem
|
2015
|
Completed
|
26.
|
Feasibility report for implementation plan for temporary storage of refuse derived fuel (RDF)
|
M/s. Pallavapuram Tambaram MSW Pvt. Limited
|
2016
|
Completed
|
27.
|
Report on technical feasibility of Sewage treatment plant (50 KlD)
|
M/s. CEEBROS Hostel Private Limited
|
2016
|
Completed
|
28.
|
Report on technical feasibility of Sewage treatment plant (400 KlD)
|
Enviro Services Pvt Ltd.,
|
2016
|
Completed
|
29.
|
Report on technical feasibility of Sewage treatment plant (290 KlD)
|
CLAR Aqua Pvt Ltd, Chennai
|
2016
|
Completed
|
30.
|
Report on technical feasibility of Sewage treatment plant (200 KlD)
|
CLAR Aqua Pvt Ltd, Chennai
|
2016
|
Completed
|
31.
|
Sampling and analysis of MSW and preparation of reports in Municipal Solid waste processing and disposal facilities
|
Madurai City Corporation
|
2016
|
Completed
|
32.
|
Report on technical feasibility of Sewage treatment plant (200 KlD)
|
CLAR Aqua Pvt Ltd, Chennai
|
2016
|
Completed
|
33.
|
Report on technical feasibility of Sewage treatment plant (40 KlD)
|
M/s. Diamond Infra construction (P) Ltd., Chennai
|
2016
|
Completed
|
34.
|
Report on technical feasibility of Sewage treatment plant (400 KlD)
|
CLAR Aqua Pvt Ltd, Chennai
|
2017
|
Completed
|
35.
|
Report on technical feasibility of Sewage treatment plant (300 KlD)
|
CLAR Aqua Pvt Ltd, Chennai<
|
2017
|
Completed
|
36.
|
Calculation of rate of flow of UGSS
|
Mayiladuthurai Municipality
|
2017
|
Completed
|
37.
|
Review of Implementation plan for Scientific Closure of the Municipal Solid Waste Dumpsite
|
Tirunelveli City Municipal Corporation
|
2015-2017
|
Completed
|
38.
|
Report on technical feasibility of Sewage treatment plant (275 KlD)
|
CLAR Aqua Pvt Ltd, Chennai
|
2020
|
Completed
|