Projects
RESEARCH PROJECTS
| Sl.No | Project Title | Funded By | Project Duration | Amount Rs. in lakhs | Status |
|---|---|---|---|---|---|
| 1. | Non-Linear Soil-Structure Interaction of Piles on Sloping Ground | Department of Science and Technology (DST) | 2007-2010 | 10.16 | Completed |
| 2. | Evaluation of Geotechnical Properties of Lunar Soil Simulant (LSS) for Chandrayaan- 2 Mission- Lunar Terrain Test Facility | ISRO –ISAC, Bangalore | Sep 2011-April 2012 | 3.97 | Completed |
| 3. | Study on External Dump Slope Stabilization/ Drainage System for Mine – II, NLC | NLC, Neyveli | Feb 2012-Dec 2012 | 12.75 | Completed |
| 4. | Slope stability analysis and design for Mine-1A, NLC | NLC, Neyveli | June 2012-Dec 2012 | 6.50 | Completed |
| 5. | Characterization of Lunar Soil Simulant for Evaluating Design Criteria of Lunar Structures | ISRO - RESPOND | Sep 2018-Aug 2021 | 18.36 | Ongoing |
| 6. | Soil-Monopile-Wave Interaction study for monopile supported offshore wind turbine | SPARC-II, MHRD | 48.26 lakh/2019 | UK Partner Proposal under review (Proposal-Id : 2652) | |
| 7. | Geotechnical techniques for the preservation of monuments and historic sites in India | SPARC-II, MHRD | 47.06 lakh/2019 | Italy Partner Proposal under review (Proposal-Id : 2641) | |
MAJOR CONSULTANCY PROJECTS
| Sl. No. | Title | Sponsoring Agency | Status |
|---|---|---|---|
| 1 | Geotechnical investigations and suitable foundation recommendation for BHEL Expansion Works at Trichy and Thirumayam, Tamilnadu | BHEL-Trichy | Completed (2009 & 2010) |
| 2 | Safe Barrier Design for Open Mining at Mine-II, Neyveli, India | NLC, Neyveli | Completed (2009) |
| 3 | Geotechnical investigations and foundation design for fish landing centers at varies places in the East Coast of Tamilnadu under Tsunami Project Implementation | Tsunami Project Implementation Division funded by World Bank | Completed (2010) |
| 4 | Geotechnical Investigations and foundation recommendation including pile design for Tamilnadu Slum Clearance Board work in Trichy and Madurai division | Tamilnadu Slum Clearance Board | Completed (2010 & 2011) |
| 5 | Estimation of dynamic soil properties for cooler design for Ultratech Cement Plant at Ariyalur | Ultratech Cement Limited | Completed (2011) |
| 6 | Detailed Geotechnical investigation and foundation recommendation for Yathri Nivas, Srirangam Temple | PWD Trichy | Completed (2012) |
| 7 | Detailed Geotechnical investigation and foundation recommendation for IOCL Mounded Storage at Cochin Bottling | IOCL-Cochin | Completed (2012) |
| 8 | Detailed Geotechnical investigation and foundation recommendation for the proposed new Naval Land at Rameswaram | Naval Board | Completed (2012) |
| 9 | Detailed Geotechnical investigation and foundation recommendation for the proposed new Naval Land at Nagappattinam | Naval Board | Completed (2012) |
| 10 | Detailed Geotechnical investigation and pile foundation analysis for the proposed Railway B.G. line Major Bridge between Nagappattinam and Thiruthuraipoondi | Southern Railway | Completed (2012) |
| 11 | Inspection of pile load test and plate load test for the proposed Railway B.G. line between Nagappattinam and Thiruthuraipoondi | Southern Railway | Completed(2012 & 13) |
| 12 | Detailed Geotechnical investigation and suitable ground improvement recommendation including PVD design for the proposed Railway B.G. line alignment between Nagappattinam and Thiruthuraipoondi | Southern Railway | Completed (2014) |
| 13 | Forensic geotechnical investigation for failed costal diaphragm wall at Nagappattinam fishing harbor | Tamilnadu Fisheries Department | Completed(2014) |
| 14 | Analysis and design of pile foundation for the proposed CPCL oil storage tank at Nagappattinam | CPCL | Completed(2014) |
| 15 | Geotechnical investigations and foundation recommendation for the proposed New IIM Trichy campus | IIM Trichy | Completed(2014) |
| 16 | Geotechnical investigation for the proposed buildings and diaphragm wall at Modasalodai site in Cuddalore district | Tamilnadu Fisheries Department | Completed(2014) |
| 17 | Geotechnical investigation and foundation recommendation for the proposed facilities for submarine rockets RGB-12 & RGB-60 at HAPP Trichy | Military Engineering Services/ Garrison Engineering | Completed(2014) |
| 18 | Geotechnical investigation and foundation recommendation for the proposed new bus stand at Srirangam, Trichy | M/s. Jones Lang Lasalle Chennai | Completed(2014) |
| 19 | Geotechnical investigation and foundation recommendation for the proposed CAMFIL expansion work at Asoor, Trichy | CAMFIL Farr Air Filtration India Pvt. Ltd. Asoor, Trichy | Completed (2014) |
| 20 | Conducting of Sub-soil Investigation at 110KV SS Mayiladuthurai for Construction Staff Quarters for KGTPS Staff Maruthur | SE, KGTPS Kuttalam | Completed (2014) |
| 21 | Detailed Geotechnical investigation and foundation design for the proposed Construction of Dwelling Units at Thimmarayachamuthiram, and Melapandamangalam, Trichy. | Tamilnadu Slum Clearance Board, Trichy | Completed (2014) |
| 22 | Design of Sand drains and performance monitoring of railway embankment between Nagapattinam and Thiruthuraipoondi, Ch. 18000 to 23000 | M/s. RR Construction (Railway Contractor) | Completed (2014) |
| 23 | Design of Prefabricated Vertical Drains and performance monitoring of railway embankment between Nagapattinam and Thiruthuraipoondi, Ch. 13000 to 18000 | M/s. Janavi Granites & Builders (Railway Contractor) | Completed (2014) |
| 24 | Detailed Geotechnical investigation and foundation recommendation for the proposed construction at Ezhimala, Kerala for Indian Naval Academy (Phase-II work) | Naval Board / M/s. Mukesh Associates, Salem | Completed (2015) |
| 25 | Detailed geotechnical investigation and pile foundation analysis and design of the proposed Hi-Tech Gowdon at Nagappatinam project including ground improvement | Tamilnadu Civil Supply Corporation (TNCSC) | Completed (2015) |
| 26 | Geotechnical investigation and foundation recommendation for the proposed buildings at various locations in the Kumbakonam Municipality | The Commissioner Kumbakonam Municipality | Completed (2015) |
| 27 | Geotechnical Investigation and foundation recommendation for the Proposed Construction of subway | Southern Railway Tiruchchirappalli | Completed (2015) |
| 28 | Soil suitability study for embankment formation of NH67 | Madhucon Projects Ltd. | Completed (2015) |
| 29 | Geotechnical investigation and foundation recommendation-BHEL project | BHEL Trichy | Completed (2015) |
| 30 | Soil analysis for railway embankment formation suitability study | Southern Railway Tiruchchirappalli | Completed (2015) |
| 31 | Geotechnical investigation and foundation recommendation-Duraisamipuram, Vannarapettai , Sambathottam and Ariyalur | Tamilnadu Slum Clearance Board, Trichy | Completed (2015 & 2016) |
| 32 | Geotechnical Investigation and pile analysis for proposed erection of seamless communication tower by Fishing Harbour division | Fishing Harbour project division, Chennai | Completed (2016) |
| 33 | Subgrade soil suitability and soil stabilization study for Air Force Station Sulur | Garrison Engineer, Military Engineering Service | Completed (2016) |
| 34 | Geotechnical investigation and foundation recommendation- Narimedu in Pudukkottai Town | Tamilnadu Slum Clearance Board, Trichy | Completed (2017) |
| 35 | Geotechnical consultancy for Trichy Airport expansion work | AAI-Trichy | Completed (2018) |
| 36 | Geotechnical investigation and foundation recommendation for Tamilnadu Slum Clearance Board projects at Melur and Theni | Tamilnadu Slum Clearance Board, Trichy | Completed (2018) |
| 37 | Geotechnical consultancy for Madurai Airport expansion work | AAI-Madurai | Completed (2018) |
| 38 | Investigation of Cochin Airport Runway, Taxiway, Apron pavement stripping due to flood using GPR | Cochin Airport | Completed (2019) |
| 39 | Pile capacity analysis for the proposed Honnavar Port in Karnataka | L & T Infrastructure Engineering Ltd. | Completed (2019) |
| 40 | Proof checking of minor bridges and retaining wall design of the proposed Samayapuram Service Road, NH45. | Trichy Padalur Tollways Pvt.Ltd. | Completed (2019) |
| 41 | Geotechnical consultancy Services for Coimbatore Airport expansion work | AAI-Coimbatore | Completed (2019) |
| 42 | Geotechnical consultant for the proposed LOKICHAR-LAMU crude oil pipeline Project at Kenya(International consultancy Project) | SGS Kenya | Completed (2020) |
| 43 | Geotechnical consultancy Services for Madurai Airport expansion work | AAI-Madurai | Ongoing |