Student Project 2007
| 1 | PRB0501 | KIRAN DUTTA, B.N | RESOURCE ALLOCATION IN SOFTWARE PROJECTS USING GENETIC ALGORITHM | May 2007 |
| 2 | PRB0502 | NIDHIN RAM KUNNATH | RELIABILITY PREDICTION OF SOFTWARE PRODUCTS USING NON HOMOGENEOUS POISON PROCESS MODELS | May 2007 |
| 3 | PRB0503 | MOHAN KUMAR, E | MATERIAL HANDLING SYSTEM DESIGN FOR UNIDIRECTIONAL LOOP LAYOUT IN FLEXIBLE MANUFACTURING SYSTEM | May 2007 |
| 4 | PRB0504 | E. SUBHRAMANYAN EMBRANTHIRI | DESIGN PROCESS SEQUENCING USING DESIGN STRUCTURE MATRIX AND NON TRADITIONAL SEARCH TECHNIQUES | May 2007 |
| 5 | PRB0505 | KASI VISWNATHAN, N | MODELING AND OPTIMIZATION OF SUPPLY CHAIN PERFORMANCE MEASURES | May 2007 |
| 6 | PRB0506 | K. VEERAMANI | OPTIMIZATION OF SUPPLY CHAIN LOGISTIC NETWORK USING SHEEP FLOCK HEREDITY ALGORITHM | May 2007 |
| 7 | PRB0507 | KUMAR. M | SELECTION OF BEST THIRD PARTY REVERSE LOGISTICS PROVIDER USING ANALYTICAL NETWORK PROCESS | May 2007 |
| 8 | PRB0508 | VIJAY SENDHIL. M | SUPPLIER ANALYSIS FOR CONSUMER DURABLES USING CLUSTER AND DISCRIMINANT ANALYSIS | May 2007 |
| 9 | PRB0509 | ARVIND KUMAR, S | INVESTIGATION OF OPTIMIZATION TECHNIQUES FOR PRACTICAL APPLICATIONS | May 2007 |
| 10 | PRB0510 | KARTHIKEYAN, B | IMPLEMENTATION OF AIS AND SFHM ALGORITHMS TO SOLVE FMS LAYOUT PROBLEMS | May 2007 |
| 11 | PRB0511 | ANANDA BHARATHI, K. V. | COST OPTIMIZATION IN REVERSE LOGISTICS USING GENETIC ALGORITHM | May 2007 |
| 12 | PRB0512 | SATHIS KUMAR, K | ANALYSIS OF THIRD PARTY REVERSE LOGISTICS PROVIDER USING INTERPRETIVE STRUCTURAL MODEL | May 2007 |
| 13 | PRM0416 | CHANDIRAMOHAN, B | PARAMETERS OPTIMIZATION OF CO2 LASER WELDING OF MEDIUM CARBON STEEL PLATE USING TAGUCHI ALGORITHMS | May 2007 |
| Sl.No | Roll No. | Name | Title | Year |
| 1 | PRB0604 | NARENDAR, K | SIMULTANEOUS SCHEDULING OF MACHINES AND AUTOMATED GUIDED VEHICLES IN FMS USING ARTIFICIAL IMMUNE SYSTEM ALGORITHM | Dec 2007 |
| 2 | PRB0605 | BOBIN CHERIAN JOS | MODELING OF EXTENDED ENTERPRISE | Dec 2007 |
| 3 | PRB0606 | PRABHAHARAN, P | PARTICLE SWARM OPTIMIZATION FOR SCHEDULING MACHINES AND AGVS IN AN FMS | Dec 2007 |
| 4 | PRB0607 | VINAY V.PANICKER | ANALAYSIS OF INTERACTIONS AMONG THE BARRIERS OF THIRD PARTY LOGISTICS SYSTEM: AN ISM APPROACH | Dec 2007 |
| 5 | PRB0608 | PAMIDI KONDAPA NAIDU | MATHEMATICAL MODELLING AND PREDICTION OF DRILLING PARAMETERS FOR ALUMINIUM METAL MATRIX COMPOSITES USING NEURAL NETWORKS | Dec 2007 |
| 6 | PRB0609 | SHYJITH, K | SELECTION OF OPTIMUM MAINTENANCE STRATEGY USING MCDM TECHNIQUE | Dec 2007 |
| 7 | PRB0610 | KUMAR KONDA VEETI, B.N.S | ARTIFICIAL IMMUNEE SYSTEM BASED ALGORITHM FOR SOLVING MULTI OBJECTIVE SINGLE ROW LAYOUT PROBLEM IN FMS | Dec 2007 |
| 8 | PRB0611 | CHOWDARY, Y.R.K | DEVELOPMENT AND ASSESSMENT OF VIKOR METNOD FOR MULTI-CRITERIA SINGLE SOURCING | Dec 2007 |
| 9 | PRB0612 | SNEHASEEL NAIDU, A | PREDICTION OF SURFACE ROUGHNESS AND CUTTING FORCES IN CNC TURNING CENTER USING ARTIFICIAL NEURAL NETWORKS | Dec 2007 |
| 10 | PRB0613 | KARTHICK, S | MULTI-CRITERIA DECISION MAKING IN SUPPLY CHAIN USING NSGAII | Dec 2007 |
| 11 | PRM0501 | SUBBARAJ, A | VENDOR SELECTION USING PRODUCT PRIORITIZATION AND CUSTOMER EXPECTATION | Dec 2007 |